____________________________________________________
ARCH 5970 G -
Industrialization and Architecture
PRE-ENGINEERED BUILDING SYSTEMS
THE UNIVERSITY OF OKLAHOMA
- COLLEGE OF ARCHITECTURE
____________________________________________________
GROUP PROJECT
DUE THURSDAY 08.21.1997
Design, a new load bearing wall system, for residential or commercial application. Detail all connections and possible applications. Document the system in form of drawings, scaled model or full-size wall section.
You also have the option to design/build
a pre-engineered bridge for a client in Norman
the client will provide the building materials
and project requirements
You will be asked to form groups of four (4) by August 8, 1997
By this time I should have received in writing the names of the group members.
Students who have not selected a group by this time will be assigned to groups.
Preliminary Design due August 21, 1997
Submit a preliminary design showing front, side, top view and proposed location on
8 1/2" x 11" paper, in appropriate scale ( perspective optional
Completed Project due August 21, 1997
Drawings and scaled model, full-size preferred
|
Include also:
All Participants' Names on drawings
©Dr. Gruenwald 1996, 1997