Production Timeline
Deadlines vary for each production. They are set by the Design/Tech faculty. It is very important that all deadlines are followed. If you have any questions about timeline obligations prior to load-in, see the appropriate Design/Tech faculty member. What follows is a sample schedule for a Mainstage production from “load in” to “strike.” (NOTE: Deadlines may be set by the Design/Tech faculty that will supersede this example.)
| Two Weeks Prior to Opening: | Load-In/Scenic | ||||||||||||||||||||||||||||||
| Paper Tech/Lights and Sound | |||||||||||||||||||||||||||||||
| Light Hang and Focus | |||||||||||||||||||||||||||||||
| Test Special FX | |||||||||||||||||||||||||||||||
| Preliminary Sound Tape Due | |||||||||||||||||||||||||||||||
| TECH WEEK | |||||||||||||||||||||||||||||||
| One Week Prior to Opening: | FRI Crew View | ||||||||||||||||||||||||||||||
| SAT Technical Rehearsal (Dry Tech) | |||||||||||||||||||||||||||||||
| SUN Technical Rehearsal Continues (Wet Tech) | |||||||||||||||||||||||||||||||
| MON Technical Rehearsal Concludes (Wet Tech) | |||||||||||||||||||||||||||||||
| TUES Dress I | |||||||||||||||||||||||||||||||
| WED Dress II | |||||||||||||||||||||||||||||||
| Director and Designers Look at Light Cues | |||||||||||||||||||||||||||||||
| Dry Tech Sound | |||||||||||||||||||||||||||||||
| Prepare Backstage Area for Run | |||||||||||||||||||||||||||||||
| Begin Rehearsing with Musicians, Microphones, Show Tape | |||||||||||||||||||||||||||||||
| Scene Shift Rehearsal (if needed) | |||||||||||||||||||||||||||||||
| OPENING WEEK | |||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||
- Strike following run
- Optional Student Matinees for school groups 10:00am on the Second Thursday of the run.